Portion 1 - Substation design
Portion 2 - Substation supply, construction and commissioning
Portion 3 - Transmission line supply, construction and commissioning
Portion 4 - Communications design, supply, construction and commissioning
This new transmission line scope included:
- 42 km of 132kV line and the installation of 252 stobie poles of heights between 21m and 26m
- 16 brace poles and 8 main strain sections of which the first and the eighth strain sections were designed to accommodate future circuits
- Design, supply, installation and commissioning of the required 132kV plant at Snuggery and South East substations
- Procurement, design, installation, and commissioning of new protection and control systems, radio and fibre links between substations.